This blog spot is for the Development and Futher Advancment of Microtunnelling , Including the Autonomous use of the Robot in the Tunnel Mining Industry. Come share our Passion and Imagination.
1200mm Bores Head TBM
Preparation for a bore with this 1200mm Bores Head along with the Brivinni Pipe Jacking Station. All controls and gearboxes checked. Hydraulic cylinders extended and retracted - pressure tested and jacking tonnage calculated.The photos of the Bores Head below show the head after pipe jacking was completed. The Brivinni jacking station is cleaned up and ready for sale to Leed Engineering.